Electricity Tariff

SCHEDULE OF ELECTRICITY TARIFFS

NATIONAL AVERAGE UNIFORM DETERMIND WITHOUT PYA ALONG-WITH GOP APPLICABLE TARIFF FOR FAISALABAD ELECTRIC SUPPLY COMPANY (FESCO) EFFECTIVE FROM 01-07-2024

A-1 GENERAL SUPPLY TARIFF RESIDENTIAL

              

Sr. No

Tariff Category/Particulars

Fixed Charges

Rs./Cons./M

 

Fixed Charges

Rs/kW/M

Uniform Determined

with PYA Variable

Charges

Rs/kWh

GoP Applicable

Variable Charges

July to Sep-2024

Rs/kWh

GOP applicable 

Variable Charges

October 2024 onward

Rs/kWh

     

A

B

C

D

E
 

a)

For sanctioned load less

than 5 kW

         

Protected

i

Up to 50 Units - Life Line

-

 

6.76

3.95

3.95

ii

51-100 Units - Life Line   

   

11.41

7.74

7.74

iii

001-100 Units

   

29.50

7.74

11.69

iv

101-200 Units

-

 

31.86

10.06 14.16

Un-Protected

v

001 - 100 Units

-

 

30.64

16.48 23.59

vi

101-200 Units

-

 

33.76

22.95 30.07

vii

201-300 Units

-

 

36.89

34.26 34.26

viii

301-400 Units

200

 

39.93

39.15 39.15

ix

401-500 Units

400

 

41.15

41.36 41.36

x

501-600 Units

600

 

42.40

42.78 42.78

xi

601-700 Units

800

 

43.79

43.92 43.92

xii

Above 700 Units

1000

 

48.84

48.84 48.84
 

b)

For Sanctioned load 5 kW

& above

   

Peak

Off-Peak

Peak

Off-Peak

Peak Off-Peak
   

Time of Use

1000

 

44.44

38.15

48.00 41.68 48.00 41.68
  c) Pre-Paid Residential Tariff 1000   49.98 49.98 49.98

As per Authority's decision only protected residential consumers will be given the benefits of only one previous slab.

As per Authority's decision residential life line consumers will not be given any slab benefit.

Under tariff A-1, there shall be minimum monthly customer charge at the following rates even if no energy is consumed.  For customers where monthly fixed charges are 

applicable, no minimum charges shall be applicable on such consumers, even if no energy consumed.

a) Single Phase Connections: Rs. 75/- per consumer per month

b) Three Phase Connections: Rs. 150/- per consumer per month

A-2 GENERAL SUPPLY TARIFF COMMERCIAL

Sr. No

Tariff Category/

Particulars

Fixed Charges

Rs./Cons./M

Fixed Charges

Rs/kW/M

Uniform Determined

with PYA Variable

Charges

Rs/kWh

GoP Applicable

Variable Charges

July to Sep-2024

Rs/kWh

GOP applicable 

Variable Charges

October 2024 onward

Rs/kWh

    A B C D E
a)

For sanctioned load less than

5 kW

1000   37.99 38.59 38.59
b)

For sanctioned load 5 kW

& above

  1250 40.91 40.91 40.91
        Peak Off-Peak Peak Off-Peak Peak Off-Peak
c) Time of use   1250 45.32 34.52 44.97 35.30 44.97 36.30
d) Electric Vehicle Charging Station     42.99 45.55 45.55
e) Pre-Paid Residential Tariff   1250 45.01 47.10 47.10

Where fixed charges applicable rs./kW//Month, the charges shall be billed based on  25% of sanctioned load or actual MDI for the month which ever is higher.

A-2 GENERAL SERVICES

Sr. No

Tariff Category/

Particulars

Fixed Charges

Rs./Cons./M

Fixed Charges

Rs/kW/M

Uniform Determined

with PYA Variable

Charges

Rs/kWh

GoP Applicable

Variable Charges

July to Sep-2024

Rs/kWh

GoP Applicable

Variable Charges

October 2024 onward

Rs/kWh

    A B C D E
a) General Services 1000 43.97 43.64 43.64
b)

Pre-Paid General Services

SupplyTariff

1000 51.12 51.30 51.30

Where fixed charges applicable rs./kW//Month, the charges shall be billed based on  25% of sanctioned load or actual MDI for the month which ever is higher.

B - INDUSTRIAL SUPPLY TARIFFS

SR NO.

TARIFF CATEGORY/

PARTICULARS

Fixed Charges

Rs./Cons./M

Fixed Charges

Rs/kW/M

Uniform Determined

with PYA Variable

Charges

Rs/kWh

GoP Applicable

Variable Charges

July to Sep-2024

Rs/kWh

GoP Applicable

Variable Charges

October 2024 onward

Rs/kWh

    A B C D E

B1

Upto 25 kW (at 400

/230 Volts)

1000   29.38 31.95 31.95
B2(a)

Exceeding 25-500 kW

(at 400 Volts)

  1250 28.80 31.82 31.88
  Time of Use     Peak Off-Peak Peak Off-Peak Peak Off-Peak
B1(b) Up to 25kW 1000   35.29 28.64 37.89 31.20 37.89 31.20
B2(b)

Exceeding 25-500 kW

(at 400 Volts)

  1250 37.34 26.64 37.83 28.56 37.83 28.56
B3

For all loads upto 5000 kW

(at 11,33)

  1250 34.86 25.57 37.83 29.39 37.83 29.39
B4

For all loads (at 66,132 kV

and above)

  1250 35.95 26.06 37.83 29.11 37.83 29.11
Pre-Paid Industrial supply Tariff   1250 42.17 44.46 44.46

Where fixed charges applicable rs./kW//Month, the charges shall be billed based on  25% of sanctioned load or actual MDI for the month which ever is higher.

C - SINGLE POINT SUPPLY

SR NO.

TARIFF CATEGORY/

PARTICULARS

Fixed Charges

Rs./Cons./M

Fixed Charges

Rs/kW/M

Uniform Determined

with PYA Variable

Charges

Rs/kWh

GoP Applicable

Variable Charges

July to Sep-2024

Rs/kWh

GoP Applicable

Variable Charges

October 2024 onward

Rs/kWh

 

 

A

B

C

D

E

C-1

For supply at 400/230 Volts

 

 

 

 

 

a)

Sanctioned load less than

5 kW

2000

 

44.55

44.55

44.55

b)

Sanctioned load from 5 kW

&  500 kW

 

1250

41.78

41.78

41.78

C-2(a)

For supply at 11,33 kV up

to and including 5000 kW

 

1250

40.40

41.72

41.72

C-3(a)

For supply at 66 kv &

above  and sanctioned

load  above 5000 kW

 

1250

39.96

41.92

41.92

 

Time of Use

 

  Peak Off-Preak

Peak

Off-Peak

Peak Off-Peak

C-1(c)

For supply at 400/230 Volts 5

kW & upto 500 kW

  1250 48.16 38.57 47.47 38.70 47.47 38.70

C-2(b)

For supply at 11,33 kV up to

and  including 5000 kW

  1250 47.80 36.36 47.47 38.17 47.47 37.18

C-3(b)

For supply at 66 kV & above

and sanctioned load  above

5000 kW

  1250 42.86 31.09 47.47 47.47 47.47 47.47
Pre-Paid Bulk Supply Tariff   1250 53.45 37.36 37.36

Where fixed charges applicable rs./kW//Month, the charges shall be billed based on  25% of sanctioned load or actual MDI for the month which ever is higher.

D - AGRICULTURE TARIFF

SR NO.

TARIFF CATEGORY/

PARTICULARS

Fixed Charges

Rs./Cons./M

Fixed Charges

Rs/kW/M

Uniform Determined

with PYA Variable

Charges

Rs/kWh

GoP Applicable

Variable Charges

July to Sep-2024

Rs/kWh

GoP Applicable

Variable Charges

October 2024 onward

Rs/kWh

 

 

A

B

C

D E

D1(a)

SCARP less than 5 kW

-

 

41.02

41.02 41.02

D2(a)

Agricultural Tube Wells

 

400

36.61

30.05 30.05

 

 

 

 

Peak

Off-Peak

Peak Off-Peak Peak Off-Peak

D1(b)

SCARP 5 kW & above

 

400 44.06 35.84 41.02 41.02 41.02 41.02

D2(b)

Agricultural 5 kW & above

 

400 30.72 29.63 41.02 41.02 41.02 41.02
      400 33.73 37.36 37.36

Under this tariff, there shall be minimum monthly charges Rs.2000/-per consumer per month, even if no energy is consumed.

Note:- The consumers having sanctioned load less than 5 kW can opt for TOU metering.

E -  TEMPORARY SUPPLY TARIFFS

SR NO.

TARIFF CATEGORY/

PARTICULARS

Fixed Charges

Rs./Cons./M

FIXED CHARGES

R/s/kW/M

Uniform Determined

with PYA Variable

Charges

Rs/kWh

GoP Applicable

Variable Charges

July to Sep-2024

Rs/kWh

GoP Applicable

Variable Charges

October 2024 onward

Rs/kWh

 

 

A

B

C

D E

E-1(i)

Residential Supply

2000

  54.73 59.09 59.09

E-1(ii)

Commercial Supply

5000

  41.36 54.60 54.60

E-2

Industrial Supply

5000

  32.81 43.40 43.40

F - SEASONAL INDUSTRIAL SUPPLY TARIFFS

125% of relevant industrial tariff

Note:- Tariff-F consumers will have the option convert to Regular Tariff and vice versa. This option can be exercised at the time of a new connection or at the beginning of the season. Once exercised, the option remains in force for at least one year.

G -  PUBLIC LIGHTING

SR NO.

TARIFF CATEGORY/

PARTICULARS

`

Fixed Charges

Rs./Cons./M

FIXED CHARGES

R/s/kW/M

Uniform Determined

with PYA Variable

Charges

Rs/kWh

GoP Applicable

Variable Charges

July to Sep-2024

Rs/kWh

GoP Applicable

Variable Charges

October 2024 onward

Rs/kWh

 

 

A

B

C

D

E

01

Street Lighting

2000

 

44.06

44.06 44.06

H - RESIDENTIAL COLONIES ATTACHED TO INDUSTRIAL PREMISES

SR NO.

TARIFF CATEGORY/

PARTICULARS

Fixed Charges

Rs./Cons./M

FIXED CHARGES

R/s/kW/M

Uniform Determined

with PYA Variable

Charges

Rs/kWh

GoP Applicable

Variable Charges

July to Sep-2024

Rs/kWh

GoP Applicable

Variable Charges

October 2024 onward

Rs/kWh

 

 

A

B

C

D E

01

Residential Colonies

attached to industrial

premises

2000

 

43.25

43.25 43.25